URETEK ICR Gulf Coast was called to help the City of Arlington. They needed our help to seal two 18″ storm sewer pipe joints and fill a void in the concrete drainage channel. We were able to repair both issue by using our patented geopolymer technology to seal the joints and fill the void.  Through its Zero Excavation repair process, URETEK solved inflow and infiltration issues in the underground utility systems.  When it comes to point repairs and soil stabilization, URETEK is the answer, using its zero excavation repair process.